Skip to content
Close-up of industrial machinery

Factories & manufacturing

From a customer’s order to a work order your production manager approves.

Orders arrive as PDFs and specs, then change. We build systems that read them, compare every revision and prepare the work order — so production starts from the right version.

Example one · can be built

The order that changed after it arrived.

  1. The order arrives

    A customer sends an order with a specification, as a PDF.

  2. A correction follows

    A few days later the customer sends a quantity correction.

  3. The versions are compared

    The system compares the new version with the previous one and shows exactly what changed.

  4. A work order is prepared

    It prepares a work order from the current version and sends it to the production manager for approval. Nothing goes to the floor without that approval.

Measuring a pilot

Two numbers to agree on before we start.

We propose measuring a pilot of this process with two metrics. We record your current baseline with you first, then measure the same way during the pilot.

Metric 01

Time to production-ready

The time from the moment an order arrives until it is ready for production.

Metric 02

Orders returned for correction

How many orders were sent back for correction during the period.

Example two · can be built

A shift handover that is ready before the shift changes.

At the end of a shift, the system gathers the open faults and tasks from the places they are recorded and prepares one summary for the incoming shift — so nothing depends on memory or a hurried conversation.

An engineer reviewing a production line on a laptop

Both examples describe projects that can be built with you — they are not descriptions of completed installations. Our completed work is described on the Kidum Plus case study.

Start with one process

Is there a process on your floor that runs on PDFs and phone calls?

Show us one. We will map it with the people who run it and propose a pilot you can measure.